I, We, the undersigned, herewith accept the terms and conditions of the regulations as attached hereto of the Pennington County Highway Department and agree to fully comply therewith to the satisfaction of the Pennington County Highway Department. NO WORK CAN COMMENCE UNTIL APPROVED BY THE COUNTY ENGINEER OF THE PENNINGTON COUNTY HIGHWAY DEPARTMENT.
PURPOSE
County Highways are maintained for the movement of vehicles, loads and pedestrians as provided by law. In the interest of public convenience and necessity, circumstances at times makes it desirable to allow individuals and utility companies to sue the highways for other purposes. However, to prevent recurring dangerous and annoying interruptions to traffic on highways, to avoid interference with future highway construction, and to provide common and uniform standards and methods of performance, it is necessary that rigid control be maintained, that standard procedure be followed, and that standard specifications and regulations be enforced through the issuance of permits to authorize all regulated activities of the public within County Highway limits.
SPECIAL REQUIREMENTS
Ditching must follow detail attached.
All materials excavated must be disposed of outside of the County Highway Right of Way, or as the County Engineer directs.
All work must be done in a good workmanship like manner.
All work must be done without any expense to the County.
Other affected landowners, if any, shall be informed and their approval obtained by the applicant and by signing this application the applicant is indicating that he has complied with this requirement.
The Pennington County Highway Department shall be notified of the start of the work for approval.
Applicant needs to get a notification of approval before starting work.
Permit is good for one year from date of approval.
APPLICATION FOR DITCHING WORK IN ROW
The attached entrance and ditching design standards have been developed to serve as a guide in the construction of entrances. Applicants will be required to use these designs. Department inspects site, order corrective work if necessary, and returns deposit upon satisfactory completion of work.
A monetary deposit of $500.00 per mile is required and will be returned upon satisfactory completion of the work.
There is no initial applicant fee although there is an After the Fact fee of $500.00 a mile fee.
Invoice #44213 (03/29/2024)
Charge
Cost
Quantity
Total
Grand Total
Total
$0.00
Due
$0.00
Approvals
Approval
Signature
Applicant
Peter A. Nelson - 03/29/2024 11:08 AM a7d28d33daf0f12e54bc5434ddc2736f 71c09ef114f2f986d04a9f8251c697ba
#1 County Highway Engineer
Joe P. Garry - 04/02/2024 2:48 PM 5b931b95248077ed77ddaeb2c6a20be5 8e6ca3618562d40a168c698dba907c87
Application has been approved. All signatures have been obtained.