Pennington County Permitting
Status: Pending Review
Valid: 11/01/2021 - 11/01/2022
Applicant
Applicant: |
|
||||||||||||||||||||||||||||||||
Work Agreement: | Yes | ||||||||||||||||||||||||||||||||
Deposit Agreement: | Yes |
Contractor
Contractor: |
|
Work Description
Type of Work: | Culvert or Driveway Installation |
Work Description: | I recently purchased a property in Smiley Township that I would like to install a driveway and access to Lot# 1900905615 it is on 140th St NE. I do not have an exact ETA on when I will be able to secure the gravel |
Work to Start: | 11/01/2021 |
Culvert or Driveway
Type of Request: | Other: New Culvert for Address |
Site Plan
Upload Site Plan / Sketch: |
|
How many other entrances exist? | 0 |
Location
Road Number: | 140 |
Township: | Smile |
Section: | 9 |
Please mark location of work on the map: |
Terms
I, We, the undersigned, herewith accept the terms and conditions of the regulations as attached hereto of the Pennington County Highway Department and agree to fully comply therewith to the satisfaction of the Pennington County Highway Department. NO WORK CAN COMMENCE UNTIL APPROVED BY THE COUNTY ENGINEER OF THE PENNINGTON COUNTY HIGHWAY DEPARTMENT.
County Highways are maintained for the movement of vehicles, loads and pedestrians as provided by law. In the interest of public convenience and necessity, circumstances at times makes it desirable to allow individuals and utility companies to sue the highways for other purposes. However, to prevent recurring dangerous and annoying interruptions to traffic on highways, to avoid interference with future highway construction, and to provide common and uniform standards and methods of performance, it is necessary that rigid control be maintained, that standard procedure be followed, and that standard specifications and regulations be enforced through the issuance of permits to authorize all regulated activities of the public within County Highway limits.
A. Any applicant desiring to construct driveways connecting with any County Highway or other work within Right of Way shall apply at the Pennington County Highway Department and provide any necessary information. The Maintenance Foreman will investigate all proposed installations and make his recommendations to the County Engineer. The applicant will be notified as to his request. A monetary deposit of $500.00 is required and will be returned upon satisfactory completion of the work. If work is done without a permit, an After the Fact fee will be charged of $500.00.
NO WORK SHALL BE UNDERTAKEN ON COUNTY RIGHT OF WAY UNTIL THE APPROVED COPY OF THE APPLICATION HAS BEEN RECEIVED BY THE APPLICANT. A survey by Red Lake Watershed or SWCD may be required to determine proper grades.
B. Entrance design standards have been developed to serve as a guide in the construction of entrances. Applicants will be required to use these designs. Department inspects site, order corrective work if necessary, and returns deposit upon satisfactory completion of work.
The following is the Highway Department policy regarding the furnishing of culverts, located within County Right of Way, to individual land owners for accessing their property.
A. The County will supply 40' of culvert to a property owner if they meet the following criteria:
(1.) The crossing serves a parcel of a 1/4 section (nominal 160 acres) or more in size, or
(2.) The crossing was constructed during the original construction of a legal ditch system.
B. The property owner is responsible for the delivery and installation. Additional length, as approved by the Engineer, for new and existing crossings may be purchased by the property owner.
C. Only one culvert will be provided per parcel meeting the criteria above. Additional field crossings may be allowed, as approved by the Engineer. Cost of shipping, materials and installation are the responsibility of the property owner. If available, used culverts may be purchased from the County at 1/2 price of a new culvert.
D. The County will supply 40' of culvert for damaged culverts meeting the criteria of Section A. Cost for additional length, shipping and installation are the responsibility of the property owner.
E. County Road Centerline culverts, under gravel roads, will be furnished and installed by the County. The cost of installation shall be split 50/50 with the benefiting property owner.
F. This policy does not apply to Judicial Ditches because approval needs to go through a Joint Board.
G. No new crossings, or modifications of existing facilities, will be made without the approval of the local Watershed District.
H. Any construction proposed which will continue or modify works located on or within the County Right of Way shall obtain prior approval of the County Engineer's office. A survey may be required.
Invoice #43718 (10/25/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/25/2021 2:42 PM Deposit is required and will be returend upon satisfactory completion of the work. |
$500.00 | x 1 | $500.00 |
Grand Total | |||
Total | $500.00 | ||
Due | $500.00 |
Special Provisions
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Gabrael K. Kluver - 10/25/2021 2:42 PM c58c81d512509f97bd2c95386f50c558 614f83b3ce46d8de868f177adec809d3 | |
#1 County Highway Engineer |