Work Within Right-Of-Way Work Within Right-Of-Way UID # 193110
Status: Canceled
Valid: 10/16/2019 - 10/15/2020
 

Applicant

Applicant:
Name:
Test
Phone:
(123123 - 1231
Mailing Address:
123
lf mn 12345

Contractor

Contractor:
Name:
Test
Company Name:
Test
Daytime Phone Number:
(123123 - 1231
Company Mailing Address:
123
lf mn 12345

Work Description

Type of Work:
Ditch Cleaning
Work Description:
sgfh
Work to Start: 10/16/2019

Ditch

Type of Request: Change in place conditions
Length: 23 Miles

Site Plan

How many other entrances exist? 1

Location

Road Number: 2
Township: 3
Section: 4
Please mark location of work on the map:

Terms

GENERAL
  • I, We, the undersigned, herewith accept the terms and conditinos of the regulations as attached hereto of the Pennington County Highway Department and agree to fully comply therewith to the satisfaction of the Pennington County Highway Department. NO WORK CAN COMMENCE UNTIL APPROVED BY THE COUNTY ENGINEER OF THE PENNINGTON COUNTY HIGHWAY DEPARTMENT.

PURPOSE
  • County Highways are maintained for the movement of vehicles, loads and pedestrians as provided by law. In the interest of public convenience and necessity, circumstances at times makes it desirable to allow individuals and utility companies to sue the highways for other purposes. However, to prevent recurring dangerous and annoying interruptions to traffic on highways, to avoid interference with future highway construction, and to provide common and uniform standards and methods of performance, it is necessary that rigid control be maintained, that standard procedure be followed, and that standard specifications and regulations be enforced through the issuance of permits to authorize all regulated activities of the public within County Highway limits.

SPECIAL REQUIREMENTS
    1. Ditching must follow detail attached.
    2. All materials excavated must be disposed of outside of the County Highway Right of Way, or as the County Engineer directs.
    3. All work must be done in a good workmanship like manner.
    4. All work must be done without any expense to the County.
    5. Other affected landowners, if any, shall be informed and their approval obtained by the applicant and by signing this application the applicant is indicating that he has complied with this requirement.
    6. The Pennington County Highway Department shall be notified of the start of the work for approval.
    7. Applicant needs to get a notification of approval before starting work.
    8. Permit is good for one year from date of approval.
APPLICATION FOR DITCHING WORK IN ROW
    1. The attached entrance and ditching design standards have been developed to serve as a guide in the construction of entrances. Applicants will be required to use these designs. Department inspects site, order corrective work if necessary, and returns deposit upon satisfactory completion of work.
    2. A monetary deposit of $500.00 per mile is required and will be returned upon satisfactory completion of the work.
    3. There is no initial applicant fee although there is an After the Fact fee of $500.00 a mile fee.

Invoice #43052 (07/08/2019)

Charge Cost Quantity Total
Non-Taxable
added 10/15/2019 3:16 PM

A deposit of $500 per mile is required and will be returned upon satisfactory completion of the work.

$500.00 x 23 $11,500.00
Grand Total
Total $11,500.00
Due$11,500.00
This Application was canceled, so you may not pay for this Invoice.
Action: Print  

Approvals

ApprovalSignatureOptions
Applicant 
Status must be Pending Review
#1 County Highway Engineer 
Status must be Pending Review
Powered by