Work Within Right-Of-Way Work Within Right-Of-Way Permit # R2022-067, App. # App-2022-001589, UID # 194287 Status: Approved Valid: 10/01/2022 - 10/01/2023
Applicant
Applicant:
Name:
John houske
Phone:
(218
) 686
- 4718
Email Address:
johnhousk@gmail.com
Mailing Address:
11200 230av se
TRF.
MN
56701
Work Agreement:
Yes
Deposit Agreement:
Yes
Contractor
Contractor:
Name:
John Houske
Company Name:
John houske
Daytime Phone Number:
(218
) 686
- 4718
Email Address:
johnhouske@gmail.com
Company Mailing Address:
11200 230AV SE
TRF
MN
56701
Work Description
Type of Work:
Ditch Cleaning
Work Description:
CLEANIG HALF MILE OF DITCH
Work to Start:
10/01/2022
Ditch
Type of Request:
Ditch Cleaning
Length:
1 Miles
Site Plan
How many other entrances exist?
1
Location
Road Number:
85
Township:
WYANDOTTE
Section:
12
Please mark location of work on the map:
Terms
GENERAL
I, We, the undersigned, herewith accept the terms and conditions of the regulations as attached hereto of the Pennington County Highway Department and agree to fully comply therewith to the satisfaction of the Pennington County Highway Department. NO WORK CAN COMMENCE UNTIL APPROVED BY THE COUNTY ENGINEER OF THE PENNINGTON COUNTY HIGHWAY DEPARTMENT.
PURPOSE
County Highways are maintained for the movement of vehicles, loads and pedestrians as provided by law. In the interest of public convenience and necessity, circumstances at times makes it desirable to allow individuals and utility companies to sue the highways for other purposes. However, to prevent recurring dangerous and annoying interruptions to traffic on highways, to avoid interference with future highway construction, and to provide common and uniform standards and methods of performance, it is necessary that rigid control be maintained, that standard procedure be followed, and that standard specifications and regulations be enforced through the issuance of permits to authorize all regulated activities of the public within County Highway limits.
SPECIAL REQUIREMENTS
Ditching must follow detail attached.
All materials excavated must be disposed of outside of the County Highway Right of Way, or as the County Engineer directs.
All work must be done in a good workmanship like manner.
All work must be done without any expense to the County.
Other affected landowners, if any, shall be informed and their approval obtained by the applicant and by signing this application the applicant is indicating that he has complied with this requirement.
The Pennington County Highway Department shall be notified of the start of the work for approval.
Applicant needs to get a notification of approval before starting work.
Permit is good for one year from date of approval.
APPLICATION FOR DITCHING WORK IN ROW
The attached entrance and ditching design standards have been developed to serve as a guide in the construction of entrances. Applicants will be required to use these designs. Department inspects site, order corrective work if necessary, and returns deposit upon satisfactory completion of work.
A monetary deposit of $500.00 per mile is required and will be returned upon satisfactory completion of the work.
There is no initial applicant fee although there is an After the Fact fee of $500.00 a mile fee.
Invoice #43892 (09/30/2022)
Charge
Cost
Quantity
Total
Grand Total
Total
$0.00
Due
$0.00
Approvals
Approval
Signature
Applicant
John houske - 09/30/2022 3:00 PM - witnessed by Joe P. Garry 2a3dde9be88f4f1c7aca251f01648fd3 7baaba547f80a2588275b6c58348b413
#1 County Highway Engineer
Joe P. Garry - 09/30/2022 3:00 PM 4041213e4bb9e93da4cd3daac0218971 07794618ca7270d2d35b49858d173f8c
Application has been approved. All signatures have been obtained.